Saturday 30 June 2012

Jump Linear WIP



I added some more breakdowns in the first 200 frames and adjusted the timing. I also animated the background (which will probably be tweaked later on, depending if it needs to be faster or slower - it works for now) to complete the look.

 I think this is looking good enough for me to leave for the time being so I'm going to leave it here, unless feedback tells me of a change I should do, and begin blocking more breakdowns in the later frames. After that I would like to start blocking another scene if possible so that we can keep to the schedule (which I will upload when I figure out how as it's a .PDF file.)

Rachel's Blog

No comments:

Post a Comment